Chirna Chemo Pharma Pvt. Ltd.
  Home Trade Enquiry Contact Us
Featured Products
METAL PRETREATMENT AND FINISHING PRODUCTS
* Our quality is approved by IIT.
- DEGREASING & DERUSTING CHEMICALS - DGA-1
  Alkaline base Degreasing Chemical for ferrous metals.
  • 5 to 10 present in water
  • Room temp. to 95(degree)C.
  • 5 to 15 minutes immersion.
  • Air bubling recommended.
- DEGREASING & DERUSTING CHEMICALS - DGS-2
  Solvent base degreasing chemicals for ferrous and non ferrous and non ferrous metals.
  • 1 part dilutes with 2 parts of water.
  • Room temp. to 45(degree)C max.
  • 5 to 15 minutes immersion.
  • Air bubling recommended.
- DEGREASING & DERUSTING CHEMICALS - DR-1
  Phosphoric acid base derusting chemical to give rust preventive phosphate coating on ferrous parts.
  • Dilute 1 part with 2 part water.
  • Room temperature.
  • 5 to 15 minutes depending upon rust (in case rust in heavy use conventional hydrochloric acid or sulphuric acid pickling).
  • Drain our excess chemical and directly air dry the part to get greyish-black phosphate coating on ferrous part providing excellent bonding for paint and powder coatings.
- THREE IN ONE
  Preparing three in one chemical by mixing DGS-2 : DR-1 : Water - 1:2:2 part.
  • Lightly rusted and lightly greased ferrous parts can be immersed directly into 3 in 1 chemical.
  • Room temp.
  • 10 to 30 minutes.
  • Wash in water and air dry. OR immerse without washing in DR-1 for 1 to 2 minute followed by air drying to get blackish phosphate coating.
- PHOSPHATING CHEMICALS
  1. PHOS-1 : Hot phosphating chemical for seven tank process.
  • Dilute : 30 to 35 ml. per lit. (3%).
  • Temp : 60(degree)C to 90(degree)C (depending upon coating).
  • Time : 5 to 10 minutes.
  • PH : About 2.5
  • Post treatment : Dip in 0.2% chromic acid solution for 1 minute and air dry.
  • Coating weight : 10 to 12 gm/M2
  2. PHOS-2 : Cold Phosphating Chemicals for seven tank process.
  • Dilute : 80 to 1 lit. (8%).
  • Temp : Room.
  • Time : 10 to 15 minutes.
  • PH : 2.5 to 3
  Directly can be hot air dried OR immersed in 0.2% chromic acid for 1 mit and air dry.
  * No white powder forms in our hot or cold phosphating chemicals.
  * No cleaning of bath is necessary.

- ALUMINIUM CHROMATING / PHOSPHATING
  1. Chrom : Yellow-brown chromating Chemical for aluminium.
  • Dilution : 50 ml. per lit.(5%).
  • Temp : Room.
  • Time : About 5 minutes.
  • Post treatment : Wash with water followed by air dry.
  2. Chrom Phos : Green coating for aluminium.
  • Dilution : 100 ml. per lit.(10%).
  • Temp : Room.
  • Time : 10 to 20 minutes.
  • Post treatment : Wash & air dry.
- DESCALING CHEMICALS
  Liquid & jelley for stailess steel.
  • Application : Brush or spray liquid or jelley on stainless steel to remove annealing scales or welding scales in 20 to 30 minutes.
  • Precaution : The liquid/jelley is highly corrosive Avoid contact with skin/eye.
- PASSIVATING CHEMICAL : LIQUID / JELLEY
  • Application : Brush or spray on dessale S.S. part. Treatment time about 30 minutes. Wash the chemical finally with water.
- RC RUST CONVERTER / PRIMER
  • Arrest Rusting : This advance chemial formulation absorbs existing rust and converts then into black non-corrosive coating/primer.
  • Surface preparation : RC eliminates all surface preparation processes such as sandblasing, scapping and acid pickling.
  • Easy to use : RC can be brushed, rolled or sprayed. It is water base, nonflammable and low toxic with pot life of one year or more.
  • Major Application Areas : Pipe lines, pumps, Storage tanks, Chemical Plants, cooling towers, Overhead cranes, Machineries, Steel Platforms. Conveyers, Material handling equipments, Steel Structures, Steel Reinforcement rods in RCC Structures. Marine equipments, Ship Reinforcement rods and hull area, ship repair equipments etc.
  • Direction for use : Clean the surface free of loose rust, dirt oil and any other contaminants. Wash the surface with fresh water thoroughly. Shake the container well before use. Apply RC by brush or spray. It will dry and form into a black coating use water if thinning is necessary. Apply second coat after four to five hours. Finished paints can be applied after 24 hours.
- LUBRICANT POWDER
  • Application : Used in wire drawing plants for ferrous and non-ferrous metals.
Hydrazine Compounds Hydrazine Compounds
- Phenyl Hydrazine
- Phenyl Hydrazine   Hydrochloride
- Phenyl Hydrazine   Base
  - 1-Phenyl 3- Methyl 5-   Pyrazoline  
  - Propargyl Chloride  
...more
Bulk Drugs Intermediates Bulk Drugs Intermediates
- Methyl Salicilate
- Salicilamide
- Phthalimide
...more
Basic Chemicals Basic Chemicals
- Ammonium Chloride
- Zinc Sulphate
- Copper Sulphate
...more
Laboratory Chemicals Fine Organics and Laboratory Chemicals
- Cresol Red
- Eosine
- Giemsas Stain
...more
Metal Pretreatment Metal Pretreatment & Finishing Products
- Phosphating Chemicals
- Descaling Chemicals
- Degreasing Chemicals
...more
Intermediate of Fluconazole & Agro Chemicals Metal Pretreatment & Finishing Products
- 1-H-1,2,4-TRIAZOLE

- 4-Amino1,2,4-Triazole

- DFTA
...more
 
Website Maintained & Promoted by Website Designing India